District 08 · Midland · Monday
District 08 drilling permits issued December 15, 2025
8 permits from 4 operators, 7 horizontal. 8 drill.
Data through August 19, 2026. RRC posts the daily permit file each business day and EZRRC ingests it nightly.
Every permit issued December 15, 2025 in District 08
| County | Operator | Lease | Well | API number | Type | Profile | Depth (ft) | Field | Permit |
|---|---|---|---|---|---|---|---|---|---|
| Andrews | WATERBRIDGE STATELINE LLC | SPDTX SWD | 19 | 42-003-49282 |
DRILL | Vertical | 7,000 | NELSON (CLEAR FORK, LOWER) | 912116 Well on oilandgasinfo.com |
| Crane | MEWBOURNE OIL COMPANY | UL CAZADOR 15/3 C | F101NK | 42-103-37729 |
DRILL | Horizontal | 10,015 | PEART (BARNETT) | 911538 Well on oilandgasinfo.com |
| Howard | BAYSWATER OPERATING COMPANY LLC | HIMALAYA 13-24 | U 3W | 42-227-42805 |
DRILL | Horizontal | 7,100 | SPRABERRY (TREND AREA) | 912175 Well on oilandgasinfo.com |
| Martin | PIONEER NATURAL RES. USA, INC. | DAVIDSON-HALE 62A | 1H | 42-317-47097 |
DRILL | Horizontal | 10,247 | SPRABERRY (TREND AREA) | 911802 Well on oilandgasinfo.com |
| Martin | PIONEER NATURAL RES. USA, INC. | DAVIDSON-HALE 62B | 2H | 42-317-47098 |
DRILL | Horizontal | 10,247 | SPRABERRY (TREND AREA) | 911804 Well on oilandgasinfo.com |
| Martin | PIONEER NATURAL RES. USA, INC. | DAVIDSON-HALE 62C | 3H | 42-317-47099 |
DRILL | Horizontal | 10,247 | SPRABERRY (TREND AREA) | 911805 Well on oilandgasinfo.com |
| Martin | PIONEER NATURAL RES. USA, INC. | DAVIDSON-HALE 62D | 4H | 42-317-47100 |
DRILL | Horizontal | 10,247 | SPRABERRY (TREND AREA) | 911806 Well on oilandgasinfo.com |
| Martin | PIONEER NATURAL RES. USA, INC. | DAVIDSON-HALE 62E | 5H | 42-317-47101 |
DRILL | Horizontal | 10,247 | SPRABERRY (TREND AREA) | 911807 Well on oilandgasinfo.com |
Counties
Operators
Download this slice
Download this day — CSV, Excel, GeoPackage Whole dataset
The link opens the dataset page with this slice already chosen; pick a format there and add it to your download. Free. Sign in, or create an account, and confirm an email address before the file builds — that is the only gate, and it is there so we can tell you when a large export is ready.