Every permit issued September 18, 2026 in District 08

County Operator Lease Well API number Type Profile Depth (ft) Field Permit
Andrews SABALO II OPERATING, LLC UL BLUE WATER 36-25 A 1JM 42-003-49452 DRILL Horizontal 9,200 SPRABERRY (TREND AREA) 918767 Well on oilandgasinfo.com
Andrews SABALO II OPERATING, LLC UL BLUE WATER 36-25 A 1LS 42-003-49454 DRILL Horizontal 9,600 SPRABERRY (TREND AREA) 918765 Well on oilandgasinfo.com
Andrews SABALO II OPERATING, LLC UL BLUE WATER 36-25 C 1DN 42-003-49453 DRILL Horizontal 9,800 SPRABERRY (TREND AREA) 918769 Well on oilandgasinfo.com
Andrews SABALO II OPERATING, LLC UL BLUE WATER 36-25 C 2JM 42-003-49455 DRILL Horizontal 9,200 SPRABERRY (TREND AREA) 918768 Well on oilandgasinfo.com
Crane RING ENERGY, INC. LEA, P.J. ETAL 4029TH 42-103-37840 DRILL Horizontal 5,020 LEA (CONSOLIDATED) 918012 Well on oilandgasinfo.com
Crane RING ENERGY, INC. LEA, P.J. ETAL 4026MH 42-103-37838 DRILL Horizontal 4,000 LEA (CONSOLIDATED) 918008 Well on oilandgasinfo.com
Crane RING ENERGY, INC. LEA, P.J. ETAL 4027TH 42-103-37839 DRILL Horizontal 5,000 LEA (CONSOLIDATED) 918011 Well on oilandgasinfo.com
Howard SM ENERGY COMPANY ROHL A 311H 42-227-42917 DRILL Horizontal 9,800 SPRABERRY (TREND AREA) 917525 Well on oilandgasinfo.com
Reeves LAKEWOOD ENERGY LLC STATE BLUE QUAIL EAST 2HU 42-389-42323 DRILL Horizontal 15,000 PHANTOM (WOLFCAMP) 918680 Well on oilandgasinfo.com
Reeves LAKEWOOD ENERGY LLC STATE BLUE QUAIL WEST 1HU 42-389-42322 DRILL Horizontal 15,000 PHANTOM (WOLFCAMP) 918655 Well on oilandgasinfo.com
Reeves PERUN ENERGY LLC CAYENNE PEPPER WA 3H 42-389-42325 DRILL Horizontal 11,000 HOEFS T-K (WOLFCAMP) 918785 Well on oilandgasinfo.com
Ward PITTS ENERGY CO. EDWARDS, JACK -H- 1 42-475-10370 RECOMPLETION Vertical 5,350 JANELLE (CLEAR FORK) 917808 Well on oilandgasinfo.com

Download this slice

Download this day — CSV, Excel, GeoPackage Whole dataset

The link opens the dataset page with this slice already chosen; pick a format there and add it to your download. Free. Sign in, or create an account, and confirm an email address before the file builds — that is the only gate, and it is there so we can tell you when a large export is ready.