District 08 · Midland · Friday
District 08 drilling permits issued September 11, 2026
8 permits from 5 operators, 7 horizontal. 8 drill.
Data through September 18, 2026. RRC posts the daily permit file each business day and EZRRC ingests it nightly.
Every permit issued September 11, 2026 in District 08
| County | Operator | Lease | Well | API number | Type | Profile | Depth (ft) | Field | Permit |
|---|---|---|---|---|---|---|---|---|---|
| Howard | SURGE OPERATING, LLC | MIDDLETON UNIT A 47-38 | 2MH | 42-227-42924 |
DRILL | Horizontal | 9,000 | SPRABERRY (TREND AREA) | 918456 Well on oilandgasinfo.com |
| Howard | SURGE OPERATING, LLC | MIDDLETON UNIT A 47-38 | 3CH | 42-227-42925 |
DRILL | Horizontal | 9,000 | SPRABERRY (TREND AREA) | 918461 Well on oilandgasinfo.com |
| Howard | SURGE OPERATING, LLC | MIDDLETON UNIT A 47-38 | 3MH | 42-227-42926 |
DRILL | Horizontal | 9,000 | SPRABERRY (TREND AREA) | 918463 Well on oilandgasinfo.com |
| Loving | GREENLAKE ENERGY OPERATING, LLC | MEDICINE BOW 56-1-47 | 1U | 42-301-37958 |
DRILL | Horizontal | 12,000 | PHANTOM (WOLFCAMP) | 918481 Well on oilandgasinfo.com |
| Loving | GREENLAKE ENERGY OPERATING, LLC | MEDICINE BOW 56-1-47 | 2U | 42-301-37959 |
DRILL | Horizontal | 12,000 | PHANTOM (WOLFCAMP) | 918483 Well on oilandgasinfo.com |
| Midland | DIAMONDBACK E&P LLC | PEGGY 20 N | U 2WB | 42-329-48551 |
DRILL | Horizontal | 13,000 | SPRABERRY (TREND AREA) | 917656 Well on oilandgasinfo.com |
| Ward | OCCIDENTAL PERMIAN LTD. | SEALY SMITH FOUNDATION | 4301H | 42-475-39111 |
DRILL | Horizontal | 9,000 | MONAHANS (CLEAR FORK) | 918175 Well on oilandgasinfo.com |
| Winkler | BASIN OIL & GAS OPERATING, LLC | BAIRD, W. E. | 1307 | 42-495-35235 |
DRILL | Vertical | 6,700 | KEYSTONE (CONSOLIDATED) | 918476 Well on oilandgasinfo.com |
Counties
Operators
Download this slice
Download this day — CSV, Excel, GeoPackage Whole dataset
The link opens the dataset page with this slice already chosen; pick a format there and add it to your download. Free. Sign in, or create an account, and confirm an email address before the file builds — that is the only gate, and it is there so we can tell you when a large export is ready.