Permits per month, last two years

permits per month, oldest to newest

MonthPermits
2026-080
2026-070
2026-060
2026-050
2026-040
2026-030
2026-020
2026-010
2025-120
2025-110
2025-100
2025-090
2025-080
2025-070
2025-060
2025-050
2025-040
2025-030
2025-029
2025-010
2024-120
2024-110
2024-100
2024-090

Counties

  1. Ward 9

Districts

  1. District 08 9

Every permit, last two years

Issued County Operator Lease Well API number Type Profile Depth (ft) Field Permit
2025-02-06 Ward TAP ROCK OPERATING, LLC FLOTILLA E 212H 42-475-38943 DRILL Horizontal 13,000 PHANTOM (WOLFCAMP) 904870 Well on oilandgasinfo.com
2025-02-06 Ward TAP ROCK OPERATING, LLC FLOTILLA F 132H 42-475-38944 DRILL Horizontal 13,000 PHANTOM (WOLFCAMP) 904868 Well on oilandgasinfo.com
2025-02-06 Ward TAP ROCK OPERATING, LLC FLOTILLA G 222H 42-475-38945 DRILL Horizontal 13,000 PHANTOM (WOLFCAMP) 904867 Well on oilandgasinfo.com
2025-02-06 Ward TAP ROCK OPERATING, LLC FLOTILLA H 217H 42-475-38946 DRILL Horizontal 13,000 PHANTOM (WOLFCAMP) 904866 Well on oilandgasinfo.com
2025-02-06 Ward TAP ROCK OPERATING, LLC FLOTILLA H 217H 42-475-38946 DRILL Horizontal 13,000 PHANTOM (WOLFCAMP) 904866 Well on oilandgasinfo.com
2025-02-05 Ward TAP ROCK OPERATING, LLC FLOTILLA A 211H 42-475-38939 DRILL Horizontal 13,000 PHANTOM (WOLFCAMP) 904873 Well on oilandgasinfo.com
2025-02-05 Ward TAP ROCK OPERATING, LLC FLOTILLA B 221H 42-475-38940 DRILL Horizontal 13,000 PHANTOM (WOLFCAMP) 904872 Well on oilandgasinfo.com
2025-02-05 Ward TAP ROCK OPERATING, LLC FLOTILLA C 131H 42-475-38941 DRILL Horizontal 13,000 PHANTOM (WOLFCAMP) 904871 Well on oilandgasinfo.com
2025-02-05 Ward TAP ROCK OPERATING, LLC FLOTILLA D 215H 42-475-38942 DRILL Horizontal 13,000 PHANTOM (WOLFCAMP) 904869 Well on oilandgasinfo.com

Download this slice

Last two years, this operator — CSV, Excel, GeoPackage Every permit ever issued to this operator Whole dataset

The link opens the dataset page with this slice already chosen; pick a format there and add it to your download. Free. Sign in, or create an account, and confirm an email address before the file builds — that is the only gate, and it is there so we can tell you when a large export is ready.