District 08 · Midland · Monday
District 08 drilling permits issued August 24, 2026
8 permits from 4 operators, 8 horizontal. 8 drill.
Data through August 24, 2026. RRC posts the daily permit file each business day and EZRRC ingests it nightly.
Every permit issued August 24, 2026 in District 08
| County | Operator | Lease | Well | API number | Type | Profile | Depth (ft) | Field | Permit |
|---|---|---|---|---|---|---|---|---|---|
| Loving | PDEH LLC | CYCLONE 54-2 STATE UNIT | 2241H | 42-301-37940 |
DRILL | Horizontal | 10,800 | SANDBAR (BONE SPRING) | 917945 Well on oilandgasinfo.com |
| Loving | PDEH LLC | CYCLONE 54-2 STATE UNIT | 2242H | 42-301-37941 |
DRILL | Horizontal | 10,800 | SANDBAR (BONE SPRING) | 917946 Well on oilandgasinfo.com |
| Midland | PIONEER NATURAL RES. USA, INC. | ODANIEL-FLOYD 1E | 105H | 42-329-48517 |
DRILL | Horizontal | 10,349 | SPRABERRY (TREND AREA) | 917326 Well on oilandgasinfo.com |
| Midland | PIONEER NATURAL RES. USA, INC. | ODANIEL-FLOYD 60B | 102H | 42-329-48519 |
DRILL | Horizontal | 10,349 | SPRABERRY (TREND AREA) | 917329 Well on oilandgasinfo.com |
| Reeves | COTERRA ENERGY OPERATING CO. | STATE BLACK DIAMOND UNIT | 4H | 42-389-42256 |
DRILL | Horizontal | 11,000 | PHANTOM (WOLFCAMP) | 917606 Well on oilandgasinfo.com |
| Reeves | COTERRA ENERGY OPERATING CO. | STATE BLACK DIAMOND UNIT | 6H | 42-389-42257 |
DRILL | Horizontal | 11,000 | PHANTOM (WOLFCAMP) | 917608 Well on oilandgasinfo.com |
| Reeves | COTERRA ENERGY OPERATING CO. | STATE BLACK DIAMOND UNIT | 7H | 42-389-42258 |
DRILL | Horizontal | 11,000 | PHANTOM (WOLFCAMP) | 917611 Well on oilandgasinfo.com |
| Reeves | U.S. ENERGY DEVELOPMENT CORP | W STATE B | 2BH | 42-389-42086 |
DRILL | Horizontal | 11,000 | PHANTOM (WOLFCAMP) | 914501 Well on oilandgasinfo.com |
Counties
Operators
Download this slice
Download this day — CSV, Excel, GeoPackage Whole dataset
The link opens the dataset page with this slice already chosen; pick a format there and add it to your download. Free. Sign in, or create an account, and confirm an email address before the file builds — that is the only gate, and it is there so we can tell you when a large export is ready.