Permits per month, last two years

permits per month, oldest to newest

MonthPermits
2026-082
2026-070
2026-067
2026-051
2026-048
2026-033
2026-020
2026-010
2025-122
2025-110
2025-103
2025-090
2025-085
2025-071
2025-060
2025-050
2025-040
2025-032
2025-020
2025-011
2024-124
2024-1112
2024-102
2024-090

Every permit, last 90 days

Issued Operator Lease Well API number Type Profile Depth (ft) Field Permit
2026-08-14 WILDFIRE ENERGY OPERATING LLC GREAT EAGLE B 2HA 42-395-32137 DRILL Horizontal 7,000 GIDDINGS (AUSTIN CHALK-3) 917795 Well on oilandgasinfo.com
2026-08-10 HILCORP ENERGY COMPANY BUCHANAN SWD 2 42-395-30812 RECOMPLETION Vertical 13,278 BALD PRAIRIE (TRAVIS PEAK) 917698 Well on oilandgasinfo.com
2026-06-30 WILDFIRE ENERGY OPERATING LLC LIGHTSEY D 1HA 42-395-32134 DRILL Horizontal 8,000 GIDDINGS (AUSTIN CHALK-3) 916036 Well on oilandgasinfo.com
2026-06-15 WILDFIRE ENERGY OPERATING LLC FLOWERS-REISTINO UNIT A 2HA 42-395-32135 DRILL Horizontal 7,000 GIDDINGS (AUSTIN CHALK-3) 916202 Well on oilandgasinfo.com
2026-06-15 WILDFIRE ENERGY OPERATING LLC FLOWERS-REISTINO UNIT B 5HA 42-395-32136 DRILL Horizontal 7,000 GIDDINGS (AUSTIN CHALK-3) 916226 Well on oilandgasinfo.com
2026-06-03 ADAMAS ENERGY LLC CAMP A 4HB 42-395-32132 DRILL Horizontal 15,400 BALD PRAIRIE (CV CONSOLIDATED) 916032 Well on oilandgasinfo.com
2026-06-03 ADAMAS ENERGY LLC CAMP A 4HB 42-395-32132 DRILL Horizontal 15,400 BALD PRAIRIE (CV CONSOLIDATED) 916032 Well on oilandgasinfo.com
2026-06-03 ADAMAS ENERGY LLC CAMP B 6HB 42-395-32133 DRILL Horizontal 15,400 BALD PRAIRIE (CV CONSOLIDATED) 916033 Well on oilandgasinfo.com
2026-06-03 ADAMAS ENERGY LLC CAMP B 6HB 42-395-32133 DRILL Horizontal 15,400 BALD PRAIRIE (CV CONSOLIDATED) 916033 Well on oilandgasinfo.com

Download this slice

Last 90 days, this county — CSV, Excel, GeoPackage Every permit ever issued in this county Whole dataset

The link opens the dataset page with this slice already chosen; pick a format there and add it to your download. Free. Sign in, or create an account, and confirm an email address before the file builds — that is the only gate, and it is there so we can tell you when a large export is ready.